Executive Summary
1 tailgate at staff door D-2
Data Hall B, 07:42 · 2 people on 1 badge · second person was an unescorted contractor
4 doors held open > 60 s
Dock door D-5 ×2, battery room 2 ×1, generator yard gate ×1 · longest 6 min 10 s (D-5, 15:20)
PPE 98% in high-risk areas
47 of 48 entries fully equipped · 1 missing face shield, battery room 2 at 14:05
Safety & Access Events (after AI review)
7
Tailgate 1 · door held 4 · blocked exit 1 · PPE 1 · from 63 raw door + video triggers
▼ 3 fewer than the 7-day average
Visitors Escorted (whole visit)
95%
21 of 22 visitors and contractors escorted · 1,174 badge entries · 9 mantrap holds, 0 forced
Safety & Compliance Alerts
3 items
-
Tailgate at staff door D-2 – Data Hall B, 07:42A contractor walked in right behind a badge holder without badging; the door logged one entry for two people. He was on the day's visitor list but had left his escort at the lobby. Security found him at 07:51 and re-escorted him. Brief both firms on one badge, one entry.
-
Fire exit E-4 blocked – 13:20 to 15:05Three crates of server rails were staged in front of emergency exit E-4 in the north corridor after the 13:00 delivery. Cleared at 15:05 after the alert. Stage deliveries in the dock cage, never in an egress route.
-
Battery room entry without face shield – 14:05A technician entered battery room 2 wearing a vest and gloves but no face shield. He left after 3 minutes and came back fully equipped at 14:11. Add a shield rack outside the door.
Door & Safety Triggers by Hour (raw door-contact + video triggers, 00:00 – 23:59)
0
2
4
6
8
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Day summary
63
Raw triggers · 7 kept after review
- Peak hour07:00 – 08:00 (8, shift change)
- Day share83% between 07:00 and 19:00
- Dismissed56 (cart moves 38, badge re-reads 18)
- Kept as events7 of 63
Compliance Evidence (5 of 63 triggers)
Two people on one badge
Fire exit blocked by crates
No face shield in the battery room
Dock door held open
Generator yard crew in full PPE
Site Map (select a zone)
Visitor area
Door / access point
Egress route
Restricted / PPE zone
Height = raw triggers
Loading Dock D-5
Door / access point
| Raw triggers | 19 |
|---|---|
| Doors held > 60 s | 2 (longest 6 min 10 s) |
| Cart moves dismissed | 17 |
Door left open while the forklift shuttled crates to the cage.
Staff Door D-2
Door / access point
| Raw triggers | 14 |
|---|---|
| Tailgates | 1 (07:42) |
| Badge entries | 286 |
| Re-reads dismissed | 13 |
Security Lobby
Visitor area
| Mantrap holds | 9 (all cleared by the guard) |
|---|---|
| Forced entries | 0 |
| Visitors signed in | 22 |
| Escorted whole visit | 21 of 22 |
Data Hall B
Restricted / PPE zone
| Raw triggers | 7 |
|---|---|
| Kept as events | 0 |
| Badge entries | 412 |
| Cage doors held | 0 |
Generator Yard
Restricted / PPE zone
| Raw triggers | 6 |
|---|---|
| Gate held > 60 s | 1 (09:44, 2 min) |
| PPE checks | 12 of 12 equipped |
Battery Room 2
Restricted / PPE zone
| Raw triggers | 4 |
|---|---|
| Door held > 60 s | 1 (14:06) |
| PPE checks | 35 of 36 equipped |
| Missing | Face shield, 14:05 |
Exit E-4
Egress route
| Raw triggers | 4 |
|---|---|
| Blocked | 13:20 – 15:05 (1 h 45 min) |
| Other exits checked | 11 of 11 clear |