Construction Site Security Report

Harlow Yards Tower · Lot 7 · Nov 17, 00:00 – 23:59
Report ID RPT-2026-1117-HYT
Generated 2026-11-18 06:05
Executive Summary
2 theft attempts stopped, nothing taken
23:47 laydown yard (copper wire spools) and 02:31 conex C-3 · strobe + talk-down, both left within 2 min
3 machines left running after shift
Telehandler TH-2, generator G-1 and light tower LT-4 · 1 h 52 min of idling, about 9 gal of fuel
Gate left unchained for 27 min
Gate G-1 open 18:04 – 18:31 after the last crew left · 1 permitted pour crew 19:05 – 21:40, matched
After-Hours Alerts (after AI review)
8
From 37 raw triggers · 29 dismissed (permitted pour crew 12, wildlife 9, wind and debris 8)
▼ 3 fewer than the 7-night average
Est. Loss Avoided (material within reach)
$41k
Copper wire spools $26k · conex C-3 tools $15k · 06:00 count matched, 0 items missing
▲ $118k avoided month to date
Security Alerts
5 items
  • Intrusion at the laydown yard – East fence, 23:47
    One person came up the verge outside the east fence, slipped through a gap in the fabric and walked to the copper wire spools. Strobe and talk-down fired 6 s after detection; the person left the way they came after 52 s. Repair the fence gap at E-6 before tonight.
  • Two people at conex C-3 – 02:31
    Two people entered over the north fence and worked at the conex lock for 40 s. Talk-down fired and the patrol guard was dispatched; both left before arrival (6 min). Lock intact, seal unbroken.
  • Equipment left running – 18:00 – 20:12
    Telehandler TH-2 idled 38 min, generator G-1 51 min and light tower LT-4 23 min after the last crew badged out. Add an idle check to the end-of-shift walk.
  • Gate left unchained – Gate G-1, 18:04
    The main gate stayed open for 27 min after the last crew left, until the guard chained it at 18:31. No one entered while it was open.
  • Hoarding door pushed open – Harlow St, 21:58
    A person pushed the street-side pedestrian door (latch not engaged) and stepped about 10 m in, then left when the talk-down fired. Counted as a breach; fix the door latch.
After-Hours Triggers by Hour (raw person, vehicle and equipment triggers · site armed 18:00 – 06:00)
Day summary
37
Raw triggers · 8 kept after review
  • Peak hour22:00 – 23:00 (6)
  • Breaches4 (2 theft attempts)
  • Detection to talk-down6 s median
  • Kept as alerts8 of 37
After-Hours Evidence (5 of 37 triggers)
Person through the east fence – CAM-Y03 Laydown yard · 23:47 · Walked to the copper spools, left after talk-down
Person through the east fence
CAM-Y03 Laydown yard · 23:47 · Walked to the copper spools, left after talk-down
1 / 5
Two people at conex C-3 – CAM-Y01 Conex row · 02:31 · Worked the lock 40 s, left before the guard arrived
Two people at conex C-3
CAM-Y01 Conex row · 02:31 · Worked the lock 40 s, left before the guard arrived
2 / 5
Telehandler idling after shift – CAM-T02 Tower base · 18:22 · Engine on, no operator for 38 min
Telehandler idling after shift
CAM-T02 Tower base · 18:22 · Engine on, no operator for 38 min
3 / 5
Main gate left unchained – CAM-G01 Gate G-1 · 18:04 · Open 27 min after the last crew left
Main gate left unchained
CAM-G01 Gate G-1 · 18:04 · Open 27 min after the last crew left
4 / 5
Permitted pour crew matched – CAM-G01 Gate G-1 · 19:05 · Concrete truck matched to permit P-118
Permitted pour crew matched
CAM-G01 Gate G-1 · 19:05 · Concrete truck matched to permit P-118
5 / 5
Site Map (select a zone)
Street / public Access point Work area Secured storage Height = triggers counted
Laydown Yard Secured storage
Triggers13
Kept as alerts1 (23:47 intrusion)
Copper spools on hand4 · $26k
Fence gapE-6, repair today

The 23:47 intrusion came through the east fence here.

Conex Row Secured storage
Triggers6
Kept as alerts1 (02:31, 2 people)
Seals3 of 3 intact
Gate G-1 Access point
Triggers6
Kept as alerts1 (left unchained)
Unchained18:04 – 18:31
Permitted entries1 pour crew (P-118)
Tower Core & Floors Work area
Triggers4
Kept as alerts1 (00:52, person at the hoist)
Pour crewL13 slab, 19:05 – 21:40
HoistParked + locked 21:52
Equipment Pad Work area
Kept as alerts3
Machines left running3
Idle time1 h 52 min
Fuel burnedabout 9 gal
Site Trailer Work area
Triggers1 (guard check-in 00:15)
DoorLocked
Harlow St Frontage Street / public
Triggers4
Kept as alerts1 (21:58, door pushed open)
Loitering2 passers-by, under 1 min